Robust and reliable cooling systems that can function for both design basis and beyond design basis conditions need to be provided for the removal of residual heat. At the Fukushima Daiichi NPP, the operators were eventually, after some delay, able to deploy portable equipment to inject water into the reactors. Cooling systems based either on installed or portable equipment need to be qualified and tested to ensure that they function and can be deployed by operators when needed.